Overhaul
We accept requests for maintenance and overhauls from customers who have installed our equipment. Please refer to the items below.
No.001 Preliminary investigation
Implementation period | Every year |
---|---|
Standard Work Time | 4.0H |
Parts for Use and Replacement | Complete set of check samples |
Notes | Perform a status check on the equipment. |

No.002 Infrared Lamp Replacement
Implementation period | Every year |
---|---|
Standard Work Time | 0.5H |
Parts for Use and Replacement | Infrared lamp [1] |
Notes | The components used vary depending on the device specifications. |

No.003 Replacement of the Fore-line Trap Element
Implementation period | Every year |
---|---|
Standard Work Time | 0.5H |
Parts for Use and Replacement | Element: 20-H026-00-050 [1 can] |
Notes | The components used vary depending on the device specifications. |

No.004 Rotary Pump Oil Change
Implementation period | every six months |
---|---|
Standard Work Time | 2.0H |
Parts for Use and Replacement | Rotary Pump Oil |
Notes | The components used vary depending on the device specifications and manufacturer. |

No.005 Heated Sample Stage Replacement
Implementation period | Every year |
---|---|
Standard Work Time | 2.0H |
Parts for Use and Replacement | Quartz stage, thermocouple, ICF gasket |
Notes | The components used vary depending on the device specifications. |

No.006 Cleaning inside the heating chamber
Implementation period | Implementation period |
---|---|
Standard Work Time | 0.5H |
Parts for Use and Replacement | ICF gasket |

No.007 Cleaning inside the load lock chamber
Implementation period | Every two years |
---|---|
Standard Work Time | 3.0H |
Parts for Use and Replacement | ICF gasket |

No.008 Sample Transfer Mechanism Leaf Spring Replacement
Implementation period | Every two years |
---|---|
Standard Work Time | 1.0H |
Parts for Use and Replacement | Leaf spring, gasket |

No.009 Infrared Guidance Mechanism Polishing
Implementation period | Every two years (depending on the contamination status of the mechanical components) |
---|---|
Standard Work Time | 1.0H |
Parts for Use and Replacement | Gasket |

No.010 TMP(2)Bearing Replacement
Implementation period | Every three years |
---|---|
Standard Work Time | 3.0H |
Parts for Use and Replacement | Bearings, gaskets |
Notes | The components used vary depending on the device specifications. |

No.011 Oil Mist Filter Replacement
Implementation period | Every four years (depending on contamination levels) |
---|---|
Standard Work Time | 0.5H |
Parts for Use and Replacement | Filter |

No.012 Gate Valve Replacement
Implementation period | Every four years |
---|---|
Standard Work Time | 4.0H |
Parts for Use and Replacement | Gate valve, gasket |
Notes | Depends on the frequency of device usage. |

No.013 Rotary Pump Replacement
Implementation period | Every five years |
---|---|
Standard Work Time | 2.0H |
Parts for Use and Replacement | Rotary pump, anti-vibration rubber |

No.014 QMS Resolution and Mass Axis Adjustment
Implementation period | Every year |
---|---|
Standard Work Time | 2.0H |
Parts for Use and Replacement | Calibration Standard Gas |

No.015 QMS Ion Source Replacement
Implementation period | Every two years (depending on contamination levels) |
---|---|
Standard Work Time | 2.0H |
Parts for Use and Replacement | Ion source, gasket |

No.016 Vacuum Start-Up and Baking Set
Implementation period | Every year |
---|---|
Standard Work Time | 2.0H |

No.017 Performance verification after overhaul
Implementation period | Every year |
---|---|
Standard Work Time | 5.0H |
Parts for Use and Replacement | Complete set of check samples |
Notes | Maintenance will always be performed. |

No.018 Measurement for QMS Calibration Curves
Implementation period | Every month |
---|---|
Standard Work Time | 1.0H |
Parts for Use and Replacement | Ion-implanted wafer |
Notes | Perform after baking for at least one day. |

No.019 Measurement for QMS Characteristic Correction
Implementation period | Every year |
---|---|
Standard Work Time | 3.0H |
Parts for Use and Replacement | Ion-implanted wafers (various types) |
Notes | Perform after baking for at least one day. |